Booked date Dec 31, 2025, 12:00 PM · from sales sheet conversion date
Score = 50 + the points above, held between 0 and 100. Points = (that group's historical close rate − the overall rate) × 100, capped at ±20, only where the group has 10+ decided leads.
Extracted from the notes, follow-ups and form text only; nothing is inferred. A correction you save wins over any future re-read.
No form submission. The master sheet lists the source as “Fluence”.
Master sheet Lead Source: “Fluence”
Sales sheet Lead Type: Fluence
Sent the color options.
Measured the space; prep is light.
Left a voicemail.
No answer; trying again tomorrow.
any type · size unknown · Murray
$5.00/sq ft – $6.78/sq ftmiddle half; median $5.63/sq ft
any project type, any size: jobs ran $4.18/sq ft to $9.41/sq ft (10th–90th percentile), totals $150 to $88,768, median job $3,750. Enter square feet for a dollar range.
Jobs whose notes mention cracking, leveling, patching, spalling, pitting, moisture or damage closed at $6.18/sq ft (n=4, median job $4,743) against $5.63/sq ft for the rest (n=1,299). Too few of either to compare yet. Tick “needs repair or leveling” to limit the comps to those jobs.
| Date | Where | Sq ft | Total | Rate |
|---|---|---|---|---|
| Aug 12, 2026 | Murray 84123same city | 770 | $4,235 | $5.50repair |
| Feb 24, 2026 | Murray 84123same city | 456 | $3,130 | $6.86repair |
| Dec 31, 2025 | Murraysame city | 1,272 | $5,800 | $4.56 |
| Mar 21, 2025 | Murraysame city | 460 | $2,600 | $5.65 |
| Jan 17, 2025 | Murray 84121same city | 535 | $2,740 | $5.12 |