Booked date Apr 19, 2022, 12:00 PM · from sales sheet conversion date
Score = 50 + the points above, held between 0 and 100. Points = (that group's historical close rate − the overall rate) × 100, capped at ±20, only where the group has 10+ decided leads.
No notes or form text has been read for this lead yet. New text is picked up within 15 minutes.
Extracted from the notes, follow-ups and form text only; nothing is inferred. A correction you save wins over any future re-read.
No form submission. The master sheet lists the source as “Mailer”.
Master sheet Lead Source: “Mailer”
Sales sheet Lead Type: HomeMag
Left a voicemail.
Asked for a weekend install.
Asked for a weekend install.
Garage · size unknown · 84129
$5.20/sq ft – $6.59/sq ftmiddle half; median $5.67/sq ft
Garage, any size: jobs ran $4.73/sq ft to $8.10/sq ft (10th–90th percentile), totals $300 to $23,515, median job $4,000. Enter square feet for a dollar range.
Jobs whose notes mention cracking, leveling, patching, spalling, pitting, moisture or damage closed at $5.50/sq ft (n=3, median job $4,235) against $5.68/sq ft for the rest (n=332). Too few of either to compare yet. Tick “needs repair or leveling” to limit the comps to those jobs.
| Date | Where | Sq ft | Total | Rate |
|---|---|---|---|---|
| Apr 19, 2022 | Taylorsville 84129same zip | 935 | $5,716 | $6.11 |
| Oct 1, 2025 | Taylorsvillesame city | 625 | $3,368 | $5.39 |
| Oct 5, 2022 | Taylorsville 84123same city | 490 | $3,545 | $7.23 |
| Jun 1, 2022 | Taylorsvillesame city | 460 | $3,410 | $7.41 |
| Oct 7, 2026 | Lead | 370 | $2,278 | $6.16 |