Closed / archived.
No commission until the master sheet says Booked.
No job on the sales sheet yet.
Score = 50 + the points above, held between 0 and 100. Points = (that group's historical close rate − the overall rate) × 100, capped at ±20, only where the group has 10+ decided leads.
Extracted from the notes, follow-ups and form text only; nothing is inferred. A correction you save wins over any future re-read.
No form submission. The master sheet lists the source as “blank”.
Spoke with the homeowner; sending the estimate today.
No answer; trying again tomorrow.
Waiting on the HOA.
any type · 240 sq ft (from the notes) · 84624
$1,571 – $2,340middle half; median $1,815
any project type, 240 sq ft ±30%: jobs ran $5.31/sq ft to $12.85/sq ft (10th–90th percentile), totals $413 to $5,111, median job $1,893. The range above multiplies your square feet by the middle half of those rates.
Jobs whose notes mention cracking, leveling, patching, spalling, pitting, moisture or damage closed at $6.18/sq ft (n=4, median job $4,743) against $5.63/sq ft for the rest (n=1,299). Too few of either to compare yet. Tick “needs repair or leveling” to limit the comps to those jobs.
| Date | Where | Sq ft | Total | Rate |
|---|---|---|---|---|
| Jun 1, 2026 | No lead linked | 240 | $1,800 | $7.50 |
| May 29, 2026 | No lead linked | 240 | $1,700 | $7.08 |
| Mar 31, 2026 | No lead linked | 240 | $1,970 | $8.21 |
| Mar 31, 2026 | No lead linked | 240 | $1,970 | $8.21 |
| Apr 26, 2024 | No lead linked | 240 | $2,010 | $8.38 |