Booked, date unknown: no status change, sales-sheet row or previous record supplies a date. Excluded from commission until set.
No commission line: the booked date is unknown.
No job on the sales sheet yet.
Score = 50 + the points above, held between 0 and 100. Points = (that group's historical close rate − the overall rate) × 100, capped at ±20, only where the group has 10+ decided leads.
No notes or form text has been read for this lead yet. New text is picked up within 15 minutes.
Extracted from the notes, follow-ups and form text only; nothing is inferred. A correction you save wins over any future re-read.
No form submission. The master sheet lists the source as “blank”.
any type · size unknown · 84121
$5.00/sq ft – $6.78/sq ftmiddle half; median $5.63/sq ft
any project type, any size: jobs ran $4.18/sq ft to $9.41/sq ft (10th–90th percentile), totals $150 to $88,768, median job $3,750. Enter square feet for a dollar range.
Jobs whose notes mention cracking, leveling, patching, spalling, pitting, moisture or damage closed at $6.18/sq ft (n=4, median job $4,743) against $5.63/sq ft for the rest (n=1,299). Too few of either to compare yet. Tick “needs repair or leveling” to limit the comps to those jobs.
| Date | Where | Sq ft | Total | Rate |
|---|---|---|---|---|
| Mar 31, 2022 | Salt Lake City 84121same zip | 917 | $6,501 | $7.09 |
| Apr 19, 2021 | Salt Lake City 84121same zip | 600 | $3,389 | $5.65 |
| Jan 19, 2021 | Salt Lake City 84121same zip | 1,050 | $5,352 | $5.10 |
| Aug 11, 2026 | 84121same zip | 483 | $2,294 | $4.75 |
| Mar 20, 2026 | Cottonwood Heights 84121same zip | 490 | $2,965 | $6.05 |