Not on the master sheet yet: no status until Harley adds the row.
No commission until the master sheet says Booked.
No job on the sales sheet yet.
Score = 50 + the points above, held between 0 and 100. Points = (that group's historical close rate − the overall rate) × 100, capped at ±20, only where the group has 10+ decided leads.
Extracted from the notes, follow-ups and form text only; nothing is inferred. A correction you save wins over any future re-read.
Commercial bay, forklift traffic, needs a durable system.
any type · 900 sq ft (from the description) · 84096
$4,306 – $5,480middle half; median $4,857
any project type, 900 sq ft ±30%: jobs ran $4.15/sq ft to $6.79/sq ft (10th–90th percentile), totals $640 to $15,411, median job $4,644. The range above multiplies your square feet by the middle half of those rates.
Jobs whose notes mention cracking, leveling, patching, spalling, pitting, moisture or damage closed at $6.18/sq ft (n=4, median job $4,743) against $5.63/sq ft for the rest (n=1,299). Too few of either to compare yet. Tick “needs repair or leveling” to limit the comps to those jobs.
| Date | Where | Sq ft | Total | Rate |
|---|---|---|---|---|
| Jun 5, 2021 | Riverton 84096same zip | 900 | $5,010 | $5.57 |
| Aug 6, 2021 | Herriman 84096same zip | 916 | $3,800 | $4.15 |
| Apr 1, 2022 | Herriman 84096same zip | 880 | $4,965 | $5.64 |
| Feb 24, 2022 | Herriman 84096same zip | 928 | $6,340 | $6.83 |
| Apr 25, 2022 | Herriman 84096same zip | 947 | $4,930 | $5.21 |